Repairing Deteriorating Sewer Systems in Hong Kong
Hong Kong’s Drainage Services Department needed a lasting fix for aging sewer manholes. ArmorThane shipped the equipment, trained local applicators and lined the walls with a seamless 120-mil polyurea barrier.
About 900 miles of pipeline carry over 700 million gallons of sewage a day to 280 treatment facilities. The infrastructure is aging, and maintenance is critical and ongoing.
The approach
Instead of patching problems or rebuilding manholes, ArmorThane proposed a polyurea spray coating to stop deterioration and strengthen the walls, working with a contractor who did pipeline repair in the region.
The outcome
Each manhole takes one to two days from cleaning to cure, with about four hours of actual spraying. With the method demonstrated and approved, 40 manholes were scheduled for maintenance.
Project Brief
Spraying polyurea on the Hong Kong project.
For Hong Kong, like other densely populated areas, handling sewage is a challenge, especially with an aging infrastructure. The network involves about 900 miles (1,448 km) of pipelines going to 280 treatment facilities, processing over 700 million gallons (2.6 billion L) of sewage per day. Maintenance is critical and ongoing.
Instead of patching existing problems or completely rebuilding manholes and other parts of the system, we proposed a long-term solution using our polyurea spray coating method to stop deterioration and strengthen walls. This entailed working with a contractor who did pipeline repair in the region. It is the same approach ArmorThane applicators use for manhole rehabilitation elsewhere.
Getting Approvals
To earn approval from government officials, Rob Anderson in our USA headquarters flew to Hong Kong to demonstrate the process and define results. While the contractor had air compressors and generators that were compatible with the local electrical systems, they did not have spraying units needed for this project.
We retrofitted and shipped high-speed, high-pressure coating equipment and product from the U.S. facility. It required 380 volt, three-phase wiring and a transformer box. Everything was then mounted on a flatbed truck for mobility.
Application Process
Actual spraying of one manhole takes about four hours. The total time for each is one to two days, depending on the size and deterioration of the manhole.
Step 1 of 4
Train the local applicators
During project approval, Anderson demonstrated processing chemicals and gun operation for maximum control and performance to local applicators. Then they trained by spraying felt samples to gain experience with the equipment before working on a manhole.
Step 2 of 4
Clean, dry and repair
The total time for each manhole is one to two days depending on its size and deterioration. This allows for all of the steps involved in cleaning, drying, repairing, spraying and curing.
Step 3 of 4
Heat and spray two coats
The two-component polyurea coating involves heating and spraying. Our high-speed, high-pressure HighLine equipment provides the control needed for successful results. The chemical reacts quickly to form a seamless protective barrier. A second coating was applied to yield an approximate total thickness of 120 mils.
HighLine polyurea outperforms other coatings because it does not crack even as the conditions cause the surface to expand and contract. It is extremely resistant to corrosive chemicals and temperature change.
Step 4 of 4
Test the coated surface
The applicator ended the project by conducting tests on the polyurea applied substrate. This involved affixing 20 mm dollies to the surface. After allowing the glue to set for 24 hours, the dollies were then drilled using a 20 mm coring hole bit.
Moving forward, 40 manholes were scheduled for maintenance.
The project in three slides
ArmorThane’s summary of the Hong Kong work. Select a slide to open it full size.
Because sewers are a grid of underground tunnels that carry waste throughout the city to the treatment facilities, there are always a number of challenges facing the task. And Hong Kong was no exception.
Rob Anderson, ArmorThane
Start a wastewater coating business
Protect infrastructure for a living.
ArmorThane sets you up to do this work, and you own the business. We make the chemistry, build the rigs, train you hands-on and answer the phone when a job gets difficult. You pay no franchise fee and no royalties. It has been that way since 1989.
Tell us what you want to spray and where you are. An ArmorThane specialist will walk you through the equipment, chemicals, training and startup cost for the work you want to do.