A wastewater treatment plant in Georgia, USA, needed to rehabilitate a 35-year-old concrete filter basin that was deteriorating after decades of service. We were tasked with restoring the basin’s integrity to be able to withstand constant exposure to water and harsh sewage chemicals; the concrete structure had developed cracks, surface wear, and areas of chemical attack from years of exposure to chlorinated water and hydrogen sulfide gases.
The restoration was needed in the midst of an ongoing upgrade to the infrastructure, which required removing sections of the basin walls to install new effluent troughs, leaving fresh concrete patches that needed protection.
We resurfaced and lined the entire basin with a thick, spray-applied ArmorThane polyurea coating, creating a seamless, durable barrier against moisture, chemicals, and physical wear for 35 more years or more of operation.